Refpages
On the
green parts of Kossuth square, Hargita square and Hősök square (16. Nemes str.)
of the 18th district of Budapest the local government desired to produce the
necessary irrigation water with new local wells, and our company was assigned
to the task.
In the
planning and design session geophysical measurements and gas-tests were carried
out, and geological, geophysical log sections and the hydrogeological log-books
of the ultimately constructed wells were produced.
During the
operation two 27 meters and one 80 meters deep well (filtered in sandy,
gravelly formations) were established, whose maximum pumping capacity was about
121 l/min.