ELMU_Trafo - Environmental remediation, fitoremediation - Biocentrum Ltd.

Go to content
Refpages
    The ELMŰ Inc. assigned our company to make an environmental survey at 114 object (power distribution and transmitter stations, oil storage tanks etc.) and oil-insulated cables at a full length of 70 km, operated by the Budapesti Elektromos Művek (Power Company of Budapest), and to plan the technical intervention for possible oil pollutions caused by industrial accidents, malfunctions, crimes or other vis mayor events.
    During our investigation 399 pcs of soil- and groundwater sampling borehole was drilled at a depth of 4-10 meters. From these sampling points 2056 pcs of soil sample, and in most cases groundwater sample was taken for laboratory tests.
    The results of our survey showed that all in all 100 000 m3 soil and 15 – 20 000 m3 groundwater was affected by contaminations, which were concentrated at one-third of the surveyed objects. The basis of the recommended technical intervention technologies were soil exchange and biological soil treatment methods. In 1998 the intervention would have cost 2-2,2 billion HUF (about 8 million USD).
    (C) 2018 Biocentrum Ltd. All Rights Reserved.
    Back to content