MOL_Eger - Environmental remediation, fitoremediation - Biocentrum Ltd.

Go to content
Refpages
During the reconstruction of a refueling station owned by MOL Inc., in Eger, as prime contractor the ÖKOPLAN-E Bt. made an environmental survey. The investigation uncovered a gasoline-contamination caused by leaking of storage tanks, concentrated in the area of older, disassembled and unearthed former storage tanks. As an operator contractor, the designing and the establishment of the necessary remediation-system was made by our company.
During our operation about 200 liters of free phase floating hydrocarbon was skimmed, and the affected groundwater was treated with the use of air-stripper equipment and the injection of enzymatic solution into the geological medium. As a result the initial 30-50 mg/l concentration was decreased to 0,2 mg/l. Additionally soil aeration was carried out, which resulted in the reduction of the contamination concentration in the soil air, from the initial 2000 ppm to 50 ppm. Ultimately the contamination was completely eliminated from the
soil – groundwater – soil air system.
(C) 2018 Biocentrum Ltd. All Rights Reserved.
Back to content