    During the centennial existence of the former glass factory in Sajószentpéter, industrial wastes, and after the closure of the factory, illegally other communal and construction wastes were deposited in its area. There was not any remediation operation carried out before in the area. Our company was given the task to make an environmental survey, and to plan the possible remediation operations.
    12 sampling borehole was drilled during the survey, 215 soil and groundwater sample were taken to measure TPH, PAH, water chemistry, toxic heavy metals, BTEX, phenols in laboratory, and based on the geological and hydrogeological conditions of the area, a hydraulic model was created.
    After the types of the contaminations, and the topogrphic conditions were identified and characterized, a three-stage remediation plan was recommended. First, the establishment of monitoring wells, and regular groundwater sampling was needed. After that, a phytoremediation is to be carried out by planting tough, fast growing plants usually used for energetic purposes. Such plants are like the Koltay-Kopeczky poplar, the fanpetal (Sida hermaphrodita), the basket willow (Salix viminalis) and the Siberian elm (Ulmus pumila “Turkestan”).
    The third stage is needed only, if the applied method is not efficient enough or the acceleration of the remediation processes is needed. In this case drain-ditches and other equipment is to be established to pump and treat a great amount of polluted groundwater.
    (C) 2018 Biocentrum Ltd. All Rights Reserved.
    Back to content