Szekesfv_Laktanya - Environmental remediation, fitoremediation - Biocentrum Ltd.

Go to content
Refpages
    More than 50 years ago in the area of the Alba Regia barrack (belonging to the city of Székesfehérvár) a fuel base was constructed and used by the army refuel their vehicles and other machinery. The fuel base consisted of 5 pieces of 50 m3 steel storage tank and the connected skimming pit, and other engineering structures with 4 well-columns, capable of skimming 350 m3 of fuel.
    In 2001, an environmental survey was done in the area by the assignment of the Ministry of Defense, and a hydrocarbon contamination was discovered in the soil and groundwater. In 2002 and 2003, modifications and repairs were made when the refueling station was rebuilt to prevent further pollution caused by structural, technical errors and malfunctions, thus the source of the pollution was eliminated.
    The mandate to remediate the contamination in the soil and groundwater was received by the Ökoproject Eger Környezetvédelmi Kereskedelmi és Szolgáltató Ltd. (Ökoproject Eger Environmental Protection Commercial and Service Ltd). As a subcontractor, Biocentrum Ltd. was an active participant in the design, construction and operation of the remediation and monitoring system, which contributed significantly to the complete elimination of the contamination.
    We used 176 pieces of 7 meters deep vacuum pump production wells, two vacuum engine rooms, and a three phase water treatment apparatus, which consisted of a phase separator and a settling unit, and an air-stripping tower equipped with activated carbon filter to clean the polluted air.
    (C) 2018 Biocentrum Ltd. All Rights Reserved.
    Back to content